Link from a project to its detailed timesheet

This is something I’ve never understood about Clockify design. It would be way more usable and straightforward if there was a link from a project (es tab status) to it detailed report. It’s only me that feels this would be a natural behavior?

Hi @Francesco_Canovi, welcome to Clockify Forum!

Thanks for the feedback! I noted your suggestion and will let you know if we decide to start working on it.

Kindly note, that when you are in the Summary report and if you group time by project, you can click on the project and it will take you to the Detailed report. Could this be useful for you?

Have a nice day!

1 Like

Ok, thank you.
Your suggestion is surely useful, while I would like to have it also from the project status.
Thank you!