Hello
Previously, I could define timeframes without specifying a project. But now when I try to stop the timer, I get this error: “Can’t save, field missing: project”
Just to check, do you perhaps have the timesheet enabled in the workspace settings? Enabling it will force Projects to be a required field.
If it’s disabled and you still can’t save the time entry, please reach out to us at support@clockify.me and we will gladly investigate this with you further.