Can't retrieve Project Budget Estimate

Hi, I’m designing a PowerBI report that is currently almost ready, but I can’t to obtain the estimation of a project when is based on a manually entered budget. I can obtaing hour based estimations (manually or auto) but when I’ve entered a fixed budget I’m not.
I’ve added the hydrated=true parameter but nothing changes.

Thank you!